Vancouver City Hall

Vancouver, BC

Engineer: Ausenco Sandwell

Fabricator: George Third & Son

The 4-story steel moment frame building, built in 1975, was seismically upgraded in 2016 using (16) external BRBs at the ground level tied into the existing structure. This was the first building in Canada to use external BRBs, and it also continued its normal operations throughout construction.